Quick answer
Generators are rated in kVA but your loads use kW. Multiply kVA by the power factor (usually 0.8) to get kW, then add margin for motor starting.

On this page: What kVA and kW mean, in plain words · Power factor and the 0.8 rule · Motor starting current: the hidden part of diesel generator sizing · A seven-step method for diesel generator sizing · Worked example 1: a small factory · Worked examples 2 and 3: an apartment building and a hospital · Practical factors that change your diesel generator sizing · Common mistakes to avoid · Frequently asked questions · Next steps for accurate diesel generator sizing
Diesel generator sizing starts with one conversion: a generator’s kVA rating is its apparent power, and the real, usable power in kW is that figure multiplied by the power factor, which is typically 0.8. So a 100 kVA set delivers about 80 kW (100 x 0.8). To size one properly, you add up the kW your equipment really draws, allow extra for motors that start with a surge, divide by 0.8 to get kVA, add a margin, and then pick the next standard size up.
Diesel generator sizing sounds simple, and in principle it is. In practice, we see people in Bangladesh buy a generator by comparing only the kVA number on a quotation, or by copying what the neighbour bought, and then wonder why the set trips when the lift starts or burns far too much diesel at light load. This guide gives you a method you can follow with a pen and a load list. You will learn what kVA and kW really mean, why motors upset the maths, how to run a seven-step calculation, and how to avoid the usual traps. There are worked examples for a small factory, an apartment building and a hospital.
What kVA and kW mean, in plain words
Think of a glass of tea with froth on top. The tea is the useful part, the froth takes up room in the glass but does not quench your thirst. In electricity, kW (kilowatts) is the tea: real power that turns shafts, heats elements and lights bulbs. kVA (kilovolt-amperes) is the whole glass: the total current-times-voltage that the generator must supply. The froth is reactive power, which motors and transformers need in order to build their magnetic fields.
The alternator inside the generator has to carry the whole glass, so its size is quoted in kVA. Your machines only turn the tea into work, so their ratings are in kW. This is why the two numbers differ and why a quotation that says “100 kVA” and one that says “80 kW” can describe the same machine.
The simple relationship behind diesel generator sizing
The formula is short:
- kW = kVA x power factor
- kVA = kW / power factor
With a power factor of 0.8, 100 kVA gives 100 x 0.8 = 80 kW. A load of 56 kW needs 56 / 0.8 = 70 kVA. Keep these two lines on a card near your desk, because every diesel generator sizing job leans on them.
Power factor and the 0.8 rule
Power factor (PF) is the ratio of useful kW to total kVA, a number between 0 and 1. If you want a deeper technical treatment, the power factor article covers it well. For our purposes, remember three points.
First, diesel generators are normally rated at a power factor of 0.8 lagging, so the kW rating of a set is 80 percent of its kVA rating. That is a standard convention, and it is the reason a 250 kVA generator is described as about 200 kW. Second, your actual load may have a better or worse power factor. Resistive loads such as heaters and incandescent lamps are close to 1.0. Induction motors, especially when lightly loaded, are often around 0.7 to 0.85. Third, a poor power factor on your side does not make the engine work harder in kW terms, but it does raise the current the alternator has to carry, so it eats into kVA headroom.
If you don’t know the power factor of your site, using 0.8 is a sensible and slightly cautious default for mixed commercial and light industrial loads.
Why the engine is quoted in kW
The diesel engine delivers mechanical power in kW, and the alternator converts it. An engine slightly bigger than the alternator’s kW rating is normal. When a dealer says a set is “prime” or “standby” rated, they are describing how long it can run at that rating. Prime power is for continuous or long-hour use with variable load. Standby power is for emergency use when the grid fails, and it is usually a bit higher on paper but with limits on running hours. In Bangladesh, where load-shedding can last for hours and some sites run generators for long daily periods, ask which rating your quoted figure refers to.
Motor starting current: the hidden part of diesel generator sizing
If every load were a lamp, diesel generator sizing would end at the previous section. Motors change that. When an induction motor starts directly from the supply, it draws a surge of current, often 3 to 6 times its normal running current for a second or two, until it reaches speed. A generator is far less able than the grid to absorb that surge, so voltage and frequency sag, lights flicker, and other equipment may drop out.
Starting methods change the surge
How the motor starts decides how big the shock is:
- Direct-on-line (DOL): the cheapest method, with the highest surge, typically 5 to 7 times running current for many industrial motors, and sometimes less for small ones.
- Star-delta starter: reduces the surge to about a third of the DOL value, so roughly 2 times running current is a fair rule of thumb.
- Soft starter: ramps up the voltage smoothly and can hold the surge to something like 2 to 3 times running current.
- Variable frequency drive (VFD): lets the motor accelerate gently, with a surge that is close to the running current, so it is the kindest to the generator.
Exact numbers vary by motor, so check the nameplate or datasheet. These multipliers are rules of thumb, good for a first estimate.
Which motors matter most
You do not need to worry about every motor in the building. You worry about the largest one, and about any group of motors that start at the same moment. Air conditioner compressors, water pumps, lift motors, air compressors and big industrial fans are the usual culprits. A generator copes best when the biggest motor starts first, while the rest of the load is small, rather than starting last with everything already running.
Stagger the starts if you can. A simple sequence timer or ATS panel that restores loads in stages makes a smaller, cheaper generator work happily.
A seven-step method for diesel generator sizing
Here is the diesel generator sizing framework we use when someone sends us a load list. Use it as a checklist.
- List every load you want the generator to carry, with its running kW from the nameplate. If the nameplate shows amps, kW is roughly volts x amps x 1.73 x power factor / 1000 for a three-phase machine.
- Add the running kW. Include lights, fans, ACs, pumps, machines, computers and servers.
- Apply diversity. Diversity means that not every load runs at the same time. If you know that two of your machines never operate together, count only the larger. Be honest here: guessing too low is how undersized sets happen.
- Convert to kVA. Divide the diversified running kW by 0.8.
- Check the starting demand. Take the largest motor, multiply its running kVA by the starting multiple for its starter type, then add the kVA of everything else that is already running.
- Add a margin. Allow roughly 10 to 25 percent for growth, ageing and heat, depending on how likely you are to add equipment.
- Choose the next standard size. Common sizes are 30, 40, 50, 60, 80, 100, 125, 150, 200, 250, 300, 350 and 500 kVA, with bigger sets available. Pick the first size above both your running figure (with margin) and your starting check, and confirm that the running load will sit at about 60 to 80 percent of the rating.
We will now run this on real-looking numbers.
Worked example 1: a small factory
Take a small workshop making plastic goods. The loads below are illustrative, not from a real customer.
| Load | Running kW | Notes |
|---|---|---|
| Lighting | 6 | LED tubes and exterior lights |
| Fans and office air conditioning | 12 | Mixed single-phase and three-phase |
| Two moulding machine motors, 15 kW each | 30 | Star-delta start |
| Air compressor | 30 | Star-delta start, largest motor |
| Miscellaneous (pumps, chargers, computers) | 10 | Small loads |
Step 2, total running load: 6 + 12 + 30 + 30 + 10 = 88 kW.
Step 3, diversity: the owner confirms that about 80 percent of this load runs together. 88 x 0.8 = 70.4 kW.
Step 4, kVA: 70.4 / 0.8 = 88 kVA.
Step 5, starting check: the compressor motor is 30 kW. Assuming about 90 percent efficiency and 0.85 power factor, its running input is 30 / (0.9 x 0.85) = about 39 kVA. With a star-delta starter we use roughly 2 times: 39 x 2 = 78 kVA. The rest of the load already running is 70.4 – 30 = 40.4 kW, which is 40.4 / 0.8 = about 50.5 kVA. Peak demand at that moment is 50.5 + 78 = 128.5 kVA.
Step 6, margin: 88 x 1.2 = 105.6 kVA for running load with 20 percent growth room.
Step 7, standard size: 125 kVA is above 105.6 but a touch below the 128.5 kVA starting demand. A generator can ride through a brief overload on starting, but voltage dip may be noticeable, so we move up to 150 kVA. Running load is then 88 / 150 = about 59 percent, a comfortable figure.
Notice what would have happened with direct-on-line starting. The compressor surge might be near 6 x 39 = 234 kVA, and 234 + 50.5 = 284.5 kVA, pushing the choice toward 300 kVA. A star-delta starter, or better a soft starter, therefore saves a large amount of generator capacity. Quite often the starter costs less than the extra generator would.
Worked examples 2 and 3: an apartment building and a hospital
Apartment building
A residential building often wants the generator only for common services during load-shedding: lifts, water pumps, corridor and stair lights, the gate and some security. Say there are two lifts at 11 kW each, one water pump of 7.5 kW running at a time (the second is standby), and 10 kW of common lighting.
- Running: 22 + 7.5 + 10 = 39.5 kW
- kVA: 39.5 / 0.8 = 49.4 kVA
- Next standard size: 50 kVA is too tight, since 49.4 / 50 is 99 percent loaded. 60 kVA gives 49.4 / 60 = 82 percent, still above the comfort band. 80 kVA gives 49.4 / 80 = 62 percent.
So we recommend 80 kVA, or 60 kVA only if the lifts use VFDs and the owner accepts a higher loading. If residents also want generator backup for flats, you need a much bigger set, or consider whether a hybrid system is smarter. Our comparison of IPS and solar hybrid inverters for load-shedding explains when batteries make more sense than a diesel set for apartments.
Hospital or clinic diesel generator sizing
Hospitals bring different priorities. Reliability beats cost. Separate the critical loads, such as operating theatre, ICU, emergency lighting, diagnostic equipment and medical gas, from the non-critical ones. Suppose the critical running load is 60 kW. Then 60 / 0.8 = 75 kVA, add 25 percent margin to get 93.75 kVA, and the next size is 100 kVA. Many hospitals add a second set so that one can be serviced while the other stands guard, a design called N+1. An ATS (automatic transfer switch) with a fast, tested changeover is essential, and some equipment will also need a UPS to bridge the few seconds of the transfer.
| Site type | Typical priority | Sizing watch-point |
|---|---|---|
| Small factory | Keep production running | Largest motor start and starter type |
| Apartment building | Lifts, pumps, common lights | Lift starting and standby pump logic |
| Hospital or clinic | Life-safety and critical care | Redundancy, fast ATS, clean power for equipment |
| Shop or showroom | Lights, ACs, billing counters | AC compressor starts, mostly single-phase |
Practical factors that change your diesel generator sizing
Load percentage and wet stacking
A diesel engine likes to work. Running a big set at 20 or 30 percent load for long hours leaves unburned fuel and soot in the exhaust, a problem often called wet stacking, and wastes diesel per kWh produced. Running above 80 to 90 percent for long periods wears the machine and leaves no spare capacity. The sweet spot is roughly 60 to 80 percent of the rating. That is why oversizing “just to be safe” is not actually safe.
Heat, humidity and installation
Engines lose some output when the air is hot and thin. Bangladesh is low-lying, so altitude derating rarely matters, but ambient temperature and a poorly ventilated generator room do. Manufacturers publish derating tables for temperature, so ask for them. A generator tucked into a small closed room with no fresh air inlet or hot-air exhaust can overheat in summer even when the size is correct. Plan for airflow, an exhaust route, a firm base and a safe fuel storage area. Our installation and site survey team looks at these points during a visit.
Single phase or three phase
Small sets for shops and homes are often single-phase, while factories, hospitals and buildings with big motors use three-phase. If you have a three-phase supply, the generator should be three-phase and your loads should be spread evenly across the phases. An unbalanced load, say one phase heavily loaded and the others light, can overheat the alternator and cause voltage problems even when the total kVA looks fine.
Canopy or open type
An open-type set is cheaper and easier to cool, but noisy and exposed to rain and dust. A canopy (silent) set has a weatherproof sound-attenuated enclosure and suits outdoor spots, residential areas and rental buildings where noise rules apply. A canopy costs more and needs careful airflow design, so ask about the cooling margin.
ATS panel and manual changeover
An ATS senses the grid failure, starts the generator and moves the load across, then returns it when the grid is back. For anything where a few minutes of blackout matter, such as a clinic, cold store or data room, an ATS is worth it. For a small shop a manual changeover switch may be fine. Whatever you pick for your diesel generator sizing and installation, the changeover must make it impossible for generator power to flow back into the utility line, a serious danger for line workers.
Fuel use, roughly
As a loose rule of thumb, diesel sets burn somewhere around a quarter to a third of a litre of fuel per kWh of electricity at healthy load. That is only approximate; real consumption depends on engine, load, fuel quality and maintenance, so always check the manufacturer’s fuel curve. As an illustration, at 60 kW for an hour you would use roughly 60 x 0.3 = 18 litres. Multiply by your hours and your local diesel price to get a running cost, and you will quickly see why avoiding oversized, lightly loaded sets matters.
Choosing a brand and a size band
Diesel generator sizing tells you the capacity. Next you choose an engine and alternator combination you can service easily. GPTECH supplies diesel generators from 20 kVA up to 2000 kVA, with well-known engine names such as Cummins and Perkins alongside Ricardo, Lambert, EVOL, GTS and Power Cell sets.
| Size band | Typical use | Things to confirm |
|---|---|---|
| 20 to 40 kVA | Shops, small offices, clinics, a few floors of a building | Single or three phase, noise, canopy |
| 50 to 100 kVA | Apartment common loads, small factories | Largest motor start, ATS |
| 125 to 250 kVA | Medium factories, hospitals, malls | Starter types, redundancy, fuel tank size |
| 300 kVA and above | Large plants, campuses, industrial parks | Paralleling option, foundation, exhaust and cooling design |
Ask for the engine model, alternator brand, the rating basis (prime or standby), warranty terms, service locations and spare parts availability. A cheap set that no one can repair nearby costs more in the end.
Common mistakes to avoid
- Treating kVA and kW as the same thing. A 100 kVA set does not run 100 kW of load. It runs about 80 kW.
- Ignoring motor starting. The running total looks fine, then the compressor starts and the generator stumbles.
- Oversizing massively in diesel generator sizing. Light loading wastes fuel and shortens engine life.
- Undersizing to save money. A set running flat out all day will fail early and have no room for growth.
- Forgetting future load. Add a sensible margin if you expect new machines or extra ACs.
- Unbalanced phases. Spread single-phase loads across all three phases.
- Weak installation. Poor ventilation, thin cables, no proper earthing or a missing fuel plan cause more trouble than the size itself.
- Skipping maintenance. Oil, filters, coolant and battery checks are cheap compared with an outage. Run the set on load regularly, even in months when the grid is steady.
- No changeover protection. Never connect a generator to a building supply without an approved changeover arrangement.
Frequently asked questions
What is the difference between kVA and kW in a generator?
kVA is the total apparent power the alternator must supply, while kW is the real power your equipment uses. They are linked by power factor, normally 0.8 for generators, so kW = kVA x 0.8. A 200 kVA set therefore gives about 160 kW.
How do I do diesel generator sizing for my factory?
List all loads in kW, apply diversity, divide by 0.8 to get kVA, check the starting demand of your largest motor, add 10 to 25 percent margin and choose the next standard size. The worked examples above show each step with numbers.
How many kW is a 100 kVA generator?
About 80 kW at a 0.8 power factor, since 100 x 0.8 = 80. Your real output depends on the load’s power factor and on whether the rating is prime or standby.
Should a generator run at full load?
Not routinely. Aim for roughly 60 to 80 percent of the rating during normal operation. Very light loading harms the engine, and constant full load leaves no headroom for surges.
How much generator do I need to start a motor or AC?
It depends on the starter type. A direct-on-line motor can need 5 to 7 times its running current for a moment, while a soft starter or VFD cuts this a lot. For ACs, inverter-type units draw a gentler start than old fixed-speed compressors. Give us the nameplate details and we will check it for you.
Is a canopy generator better than an open one?
A canopy set is quieter and protected from rain and dust, which suits residential and outdoor sites. An open set is cheaper and cools more easily, so it fits a dedicated generator room. Neither is “better” without context.
Do I need an ATS panel?
If you cannot tolerate waiting for someone to start the set and flip a switch, yes. An ATS starts the engine and transfers the load automatically. It also protects against back-feeding, which is a safety issue. Our FAQ page covers other common questions.
Can solar or batteries replace a generator?
For small loads and short outages, a battery-backed hybrid inverter can replace a generator, but heavy motors and long outages still favour diesel. Many sites use both, with solar and batteries for everyday needs and a generator for long or heavy demands.
Next steps for accurate diesel generator sizing
Good diesel generator sizing is a matter of habit: list the loads honestly, convert kW to kVA with the 0.8 rule, test the largest motor start, keep the running load in the 60 to 80 percent band, and then round up to the next standard size. If you do that, you get a set that starts everything, burns sensible fuel and lasts for years.
If you would rather have a second pair of eyes, call GPTECH on +880 1712-567878 or message us on WhatsApp and send your load list or machine nameplate photos. We offer a free site survey and quotation, supply genuine, warranty-backed generators and offer delivery across Bangladesh, as described on our shipping and delivery page. You can also reach us through the contact page whenever it suits you.
Frequently asked questions
How do I convert kVA to kW?
Multiply kVA by the power factor. At a power factor of 0.8, 100 kVA is about 80 kW.
What is the difference between kVA and kW?
kW is the real power that does work; kVA is the apparent power the generator must supply, which is higher when the power factor is below 1.
What is prime vs standby rating?
Prime rating is for continuous use with a variable load; standby rating is for emergency use only. Check which rating the listed kVA refers to.
Why leave a margin?
Motors draw several times their running current when they start, so the generator needs spare capacity.
Related products
-
Power Cell
Power Cell Cummins Diesel Generator 1600 kW / 2000.0 kVA
Call for price In stock -
Power Cell
Power Cell Cummins Diesel Generator 800 kW / 1000.0 kVA
Call for price In stock -
Power Cell
Power Cell Cummins Diesel Generator 1000 kW / 1250.0 kVA
Call for price In stock -
Power Cell
Power Cell Cummins Diesel Generator 1200 kW / 1500.0 kVA
Call for price In stock