Quick answer
Factories use three-phase supply, so use a three-phase on-grid inverter sized to your daytime load; the solar power is used on site first, which lowers what you buy from the grid.

On this page: Reading your load profile before planning rooftop solar for factories · Assessing the roof: space, strength, shade and waterproofing · Sizing a three-phase on-grid inverter · Safety and protection for a three-phase solar plant · Generators, grid failure and net metering · Monitoring, cleaning and maintenance · Payback: a worked example for rooftop solar for factories · Common mistakes to avoid · Frequently asked questions · Next steps for rooftop solar for factories
The short answer on rooftop solar for factories: a three-phase on-grid system, where panels feed a three-phase inverter that runs in step with the utility grid, can cover a large share of a factory’s daytime electricity without batteries, and it is sized from the factory’s daytime load and usable roof area, whichever is smaller. Most Bangladeshi factories run their heaviest machines between 8 am and 6 pm, which is exactly when the sun is strongest. That match between load and sunshine is why rooftop solar for factories often pays back faster than most home setups.
In this guide we walk through the whole job the way an engineer would on a site visit. You will learn how to read your load profile and electricity bills, how to judge whether your roof can carry the system, how to size a three-phase on-grid inverter, what protection a safe plant needs, how generators and the grid interact with it, how to monitor and clean it, and how to estimate payback with simple arithmetic. If you only want a rough picture, read the worked examples and the common mistakes section. If you are preparing a real project, read everything and take notes.
One honest note before we start. Net metering approval, tariffs, and technical connection rules in Bangladesh depend on your electricity distribution utility and can change over time, so we point out where you must confirm details with them rather than guessing numbers.
Reading your load profile before planning rooftop solar for factories
Every good plan for rooftop solar for factories starts with one question: when and how much electricity does your factory actually use? A solar plant cannot be sized properly from the roof alone. If you install more panels than your daytime load can use, the extra power either goes to waste or depends on what your utility allows you to export.
What a load profile is
A load profile is simply a graph of your power demand through the day. The vertical axis is power in kilowatts (kW), the horizontal axis is the hour of the day. A garment unit with sewing lines, a spinning mill, a plastic moulding workshop and a cold store will each draw a very different shape. Some are flat all day, some have sharp peaks when big motors start.
You can build a rough profile in three ways. First, ask your utility or check your main panel for a demand or energy meter that records kWh at intervals. Second, read the main meter by hand at the start and end of each shift for a week and note the difference. Third, ask an electrician to clamp a recording power meter on the incoming supply for several days. The third option is the most accurate and often costs little compared with the value of the data.
Reading your bills
Your monthly bill gives you units consumed in kWh, and for industrial connections it usually also shows maximum demand in kW and a power factor figure. Collect at least twelve months of bills. Look at three things. The first is the monthly kWh, which tells you how much energy solar could replace. The second is the seasonal swing, since summer fans, chillers and air conditioning raise consumption. The third is whether you pay any penalty related to power factor or demand, because a solar plant does not automatically fix those.
A quick method to estimate daytime use: if your factory runs one shift of ten hours and your average running load in that shift is 120 kW, your daytime energy is 120 kW x 10 h = 1,200 kWh a day. That number, not your total bill, is what solar competes with directly.
Why daytime base load matters most
The most valuable figure is your minimum load during sunshine hours, the base load. If your factory never drops below 80 kW between 9 am and 4 pm, then a solar array that peaks near 80 kW will use every unit it makes on site, with no exporting needed. An array that peaks far above that will, at noon, produce more than you use. Your plan should state clearly what happens to that surplus, and the answer depends on utility rules.
Assessing the roof: space, strength, shade and waterproofing
Factory roofs vary a lot, so rooftop solar for factories is never a copy-and-paste design. Some are reinforced concrete slabs, some are corrugated metal sheets on steel trusses, and many have a mix, with water tanks, ventilation fans, skylights and chimneys scattered about. A site survey should walk every part of it.
How much area do you need
As a rule of thumb, modern panels on a flat roof need about 6 to 8 square metres for each kilowatt-peak (kWp). The unit kWp means the power a panel array produces under standard test conditions. The space is more than the panel footprint because rows are spaced to avoid shading each other and you need walkways for cleaning and maintenance. Sloped metal roofs that face the right way can be more compact, because panels lie close to the surface.
Today’s panels are commonly in the 550 W to 730 W range, so a roof needs fewer panels than a few years ago for the same power. You can see the options in our solar panels range from makers such as Jinko and LONGi.
Structure and load bearing
Panels and their mounting frames add weight, and wind adds uplift force, which can matter more than weight on light roofs. Ask a structural engineer to confirm that your slab or purlins can carry the added load and that the fixings can resist strong monsoon and cyclone winds. Old corrugated sheets with rusted fasteners are a common problem. It is cheaper to repair the roof first than to remove panels later.
Shading and orientation
In Bangladesh, panels generally face south at a modest tilt, often around 10 to 20 degrees, though flat roofs sometimes use shallow east-west layouts to fit more panels. Shade is the silent killer of output. A water tank, a parapet wall or a neighbouring building that shades part of a panel string can cut production more than its size suggests. Walk the roof at 9 am, noon and 3 pm and note which areas get shadow.
Waterproofing
Drilling into a concrete roof for mounting bases can damage waterproofing. Where possible, use ballasted or clamp-on mounts that avoid penetrations, or make sure every drilled point is sealed properly. A leaking roof over a production floor is an expensive problem. This is a good question to put to any installer: how will you protect my waterproofing?
| Roof type | Typical mounting | Main checks |
|---|---|---|
| Flat reinforced concrete | Tilted frames on concrete bases or anchors | Waterproofing, parapet shading, space for walkways |
| Metal sheet on steel truss | Clamps fixed to the sheet ridges or rails on purlins | Truss strength, rust, wind uplift, sheet age |
| Mixed or old roof | Case by case, sometimes a separate steel structure | Structural report, water leaks, access for cleaning |
Sizing a three-phase on-grid inverter
An inverter converts the direct current (DC) from panels into alternating current (AC) that matches your factory supply. Most factories use a three-phase supply, which delivers power on three conductors and runs motors smoothly. If you want a plain background on how this works, the three-phase electric power article is a good primer.
Our guide on on-grid, hybrid and off-grid inverters explains why a factory with a fairly stable grid usually picks on-grid: no battery bank, lower cost, simpler maintenance. GPTECH stocks three-phase on-grid inverters up to 150 kW.
The DC/AC ratio in rooftop solar for factories
The DC/AC ratio compares the panel array size (kWp) with the inverter’s AC output rating (kW). A ratio of roughly 1.1 to 1.3 is a common design range. Panels rarely produce their full rated power, since heat, dust and sun angle reduce output, so a slightly oversized array keeps the inverter closer to full output for more hours of the day. On a few perfect midday hours the inverter simply limits its output, which costs little energy.
Worked sizing example
Imagine a small garment factory with these facts, all invented for illustration:
- Usable flat roof area: 800 m2
- Daytime base load: about 90 kW
- Panel size chosen: 600 W
Step 1, array size from roof area. Using 7 m2 per kWp: 800 / 7 = about 114 kWp.
Step 2, number of panels. 114,000 W / 600 W = 190 panels, which makes 190 x 600 W = 114 kWp.
Step 3, inverter size. With a target ratio of 1.2: 114 / 1.2 = 95 kW. The nearest standard size is 100 kW, so the real ratio becomes 114 / 100 = 1.14, comfortably within range.
Step 4, expected energy. A realistic yield is about 3.5 to 4.5 kWh per kWp a day. Using 4: 114 x 4 = 456 kWh a day. Over 26 working days that is about 11,856 kWh a month.
Step 5, compare with load. The factory uses roughly 90 kW x 10 h = 900 kWh in a working day, so 456 kWh is about half of that. Almost all of it is used on site, which is the ideal situation.
Strings, MPPT and voltage
Panels are wired in series into strings, and each string connects to an MPPT input on the inverter. MPPT stands for maximum power point tracking, the electronics that squeeze the most power from the panels as sunlight changes. Large inverters have several MPPT inputs so that roof sections with different angles or shading can work independently. Your designer should check that string voltage stays within the inverter window even on the coldest morning and the hottest afternoon. You can compare options from Huawei, Growatt and others using our compare tool.
| Factory size (example) | Rough array size | Inverter approach |
|---|---|---|
| Small workshop, 30 kW daytime load | 30 to 40 kWp | One 25 to 30 kW three-phase unit |
| Medium factory, 90 kW daytime load | 100 to 120 kWp | One 100 kW unit or two 50 kW units |
| Large plant, 300 kW daytime load | 300 kWp and above | Several inverters, shared monitoring |
Two smaller inverters instead of one large one can be a good choice. If one stops for service, the other keeps producing. That small redundancy often matters for plants that cannot afford to lose all their output at once.
Safety and protection for a three-phase solar plant
A factory is a serious electrical environment, and rooftop solar for factories must respect that: and a solar plant adds a new source of power on the roof. Protection is not an optional extra.
Earthing and lightning
All metal frames, rails and the inverter body must be bonded to a proper earthing system, and the earth resistance should be tested after installation. Bangladesh has frequent thunderstorms, so lightning protection and surge protection devices (SPDs) on both the DC and AC sides are sensible. An SPD diverts sudden voltage spikes to earth before they reach the inverter. Keep in mind that surge damage is a typical exclusion in warranties, so good protection also protects your warranty position.
Isolators and breakers
You need DC isolators near the inverter so that panels can be disconnected, and AC isolators and breakers on the output so the plant can be separated from the factory board. Label everything clearly, including a notice that the roof carries live DC wiring in daylight. Panels produce voltage whenever light falls on them, and you cannot simply switch them off at a distance.
Anti-islanding
Anti-islanding protection forces an on-grid inverter to shut down within moments when the grid goes down. This stops it from feeding power into a dead line where utility workers might be repairing a fault. It is a core safety feature and certified inverters have it built in. It also explains something that surprises many owners: when the grid fails, your solar plant stops too, even in full sun.
Cable quality and installation
Use solar-rated DC cable with UV protection, proper MC4 connectors that match in brand, and neat trays or conduits. Poor crimping at connectors is a leading cause of hot spots and even fires. Insist on thermal inspection or at least careful torque checks at commissioning. You can read how GPTECH approaches site work on the installation and site survey page.
Generators, grid failure and net metering
Many Bangladeshi factories keep diesel generators for the hours when the grid fails. How solar behaves around a generator is one of the questions we hear most often.
What happens during an outage
A grid-tied inverter needs a stable voltage and frequency reference to operate. When the grid trips, it switches off. If a generator then starts, the inverter may or may not reconnect, depending on how the generator’s voltage and frequency behave and on the inverter’s settings. A generator is a much weaker and less stable source than the grid, so a large solar plant feeding into it can push the generator off its normal operating point.
General approaches
In general terms, designers deal with this in one of three ways. They can keep the solar plant off while the generator runs, which is simplest. They can use a controller that limits solar output so it never exceeds a safe share of the generator’s load, which keeps the generator from being back-fed. Or they can add batteries or a hybrid system, which creates a stable local supply. The correct method depends on your generator size, your loads and the inverter model, so ask for it to be designed explicitly rather than left to chance. If you are also reviewing your generator, see our guide to diesel generator sizing.
Net metering and approvals for rooftop solar for factories
Net metering lets you send surplus electricity to the grid and receive credit for it. Whether you can do this, how credit is calculated and what paperwork the utility wants all depend on your distribution company and current rules. Please confirm with your utility before you design around any export assumption. We explain the general idea in net metering in Bangladesh, but treat that as background and not as a substitute for the utility’s own requirements.
A practical tip: design the plant so most output is used inside the factory. Then the project still works well even if export is limited or approval takes time.
Monitoring, cleaning and maintenance
A solar plant has no moving parts, but it is not maintenance-free. A bit of routine care protects your yield.
Monitoring
Most modern inverters connect to a web or phone app that shows power, daily energy and faults. Check it once a day, or ask your installer to set up alerts. A sudden drop on a sunny day, or one inverter producing much less than its neighbour, is the earliest warning of a problem. Compare each day’s energy with your own expectation, in our example about 456 kWh. If it is far lower on a clear day, investigate.
Dust and cleaning
Bangladesh has dust from construction, brick kilns, traffic and dry season winds. Factory roofs may also collect lint, fibre or soot. A dirty array can lose a noticeable share of output, and bird droppings on a single panel can limit an entire string. Clean with soft water and a soft brush or squeegee, early in the morning or in the evening when panels are cool. Never spray cold water on hot glass, and never use harsh chemicals or hard scrapers.
Monsoon rain helps wash panels, but it rarely removes oily or sticky deposits. Set a cleaning schedule that fits your site: weekly or fortnightly in dusty places, monthly where it is cleaner.
Annual checks
Once a year, have a technician tighten connections, inspect cables for sun damage and rodent bites, test the earthing, check isolators and review inverter logs. Keep records. They help with warranty claims too.
Payback: a worked example for rooftop solar for factories
Payback in rooftop solar for factories means how many years of savings it takes to recover the money you spent. The method is simple: total system cost divided by yearly savings on your electricity bill.
Important: the figures below are made-up round numbers for teaching only. They are not real prices or real tariffs. Replace them with your own quotation and your own utility bill.
Step 1, assume a system cost. Suppose a 114 kWp plant costs BDT 60,000 per kWp installed (example only). Total cost = 114 x 60,000 = BDT 6,840,000.
Step 2, find monthly energy. From the sizing example, about 11,856 kWh a month.
Step 3, assume a value per unit. Suppose each kWh of solar energy replaces grid energy worth BDT 10 (example only). Monthly saving = 11,856 x 10 = BDT 118,560.
Step 4, yearly saving. 118,560 x 12 = BDT 1,422,720.
Step 5, simple payback. 6,840,000 / 1,422,720 = about 4.8 years.
Real life adds a few adjustments. Output declines slowly each year, inverters may need servicing, cleaning has a cost, and your tariff may rise or fall. Also, some months produce less in monsoon. A careful buyer repeats the calculation with a conservative yield, say 3.5 kWh per kWp a day, and checks that the project still makes sense. In our example that gives 114 x 3.5 = 399 kWh a day, so the payback stretches a little, but not dramatically.
For a view of typical system categories and pricing logic, our solar system price guide is a helpful companion, and you can also browse ready solar packages.
| Input | Where to find it | Why it matters |
|---|---|---|
| System cost | Written quotation, all items included | Top of the payback formula |
| Yearly kWh produced | Design software or yield rule of thumb | Decides savings |
| Value of each kWh | Your own utility bill | Converts energy into money |
| Maintenance cost | Cleaning and service plan | Lowers net savings slightly |
Common mistakes to avoid
- Sizing rooftop solar for factories from the roof alone. A bigger array is not better if your daytime load cannot use it. Start with the load profile.
- Ignoring the structure. Check roof strength and wind resistance before anyone orders panels.
- Skipping shading analysis. One water tank shadow can ruin a string’s output.
- Assuming solar runs during outages. A plain on-grid plant stops when the grid stops. If you need power in an outage, ask about hybrid options.
- Forgetting the generator. Discuss interaction with your generator before commissioning, not after a problem appears.
- Buying on price alone. Cheap cable, connectors and missing surge protection cost far more later.
- Not planning for approval. Start the utility process early and keep copies of every document.
- No cleaning plan. Dust slowly eats your savings without any alarm.
- Losing paperwork. Keep invoices and serial numbers for warranty claims. See our guide on solar inverter warranty for what to keep.
Frequently asked questions
How much roof space does rooftop solar for factories need at 100 kW?
Using the 6 to 8 m2 per kWp rule of thumb, a 100 kWp array needs about 600 to 800 square metres of clear, shade-free flat roof. Metal sloped roofs can need less. A site survey gives the exact answer.
Can a factory run on rooftop solar only?
Not with an on-grid system, because it needs the grid to operate and it works only in daytime. To run in an outage or at night you need batteries, a hybrid design or a generator. Most owners of rooftop solar for factories use it to cut daytime grid use and keep the grid or generator for the rest.
What happens to my solar plant when the grid goes off?
An on-grid inverter shuts down for safety, a feature called anti-islanding. It restarts automatically when the grid returns and is stable for a short period. If a generator supplies the factory, ask your installer how the plant should behave.
Is net metering available for factories in Bangladesh?
Rules and approval procedures depend on your distribution utility and may change, so we cannot promise terms here. Contact your utility for the current process and keep your design flexible if export is limited.
How long do solar panels and inverters last?
Panels commonly carry long performance warranties and often work for decades with slowly falling output. Inverters usually have shorter warranties, varying by brand and model, so read the warranty card. Our warranty page explains how GPTECH handles claims.
Which inverter brand is suitable for a factory?
Several well-known brands work well, including Deye, Growatt, Huawei and SolaX. Pick by capacity, MPPT count, local support, monitoring quality and warranty. Our brand comparison shows the main differences.
Does dust really reduce solar output?
Yes. A thick layer can reduce production noticeably, and uneven dirt can limit a whole string. Regular gentle cleaning is cheap compared with the energy it saves.
How do I know if payback on rooftop solar for factories is realistic?
Use real quotation figures, a conservative yield of 3.5 kWh per kWp a day, and the value per unit from your own bill. If the project still works under cautious assumptions, it is a sound one.
Next steps for rooftop solar for factories
Good rooftop solar for factories comes down to a few steady habits: measure your daytime load, respect the roof, size the inverter with a sensible DC/AC ratio, protect the plant properly, plan for the generator and the utility, and keep it clean. Do those, and rooftop solar for factories usually delivers; the numbers usually speak for themselves.
If you would like help, call GPTECH on +880 1712-567878 or message us on WhatsApp for a free site survey and quotation. We supply genuine, warranty-backed solar panels and inverters with delivery across Bangladesh, and you can also reach us through the contact page. There is no pressure; a conversation and a roof visit cost you nothing.
Frequently asked questions
Why three phase?
Factories and large buildings are normally connected to a three-phase supply, so the inverter must match it to feed the same loads.
Do I need batteries?
Not for bill savings. An on-grid inverter works without batteries; add them only if you need backup during outages.
How do I size the system?
Start from your daytime electricity use and your usable shade-free roof area, then match the inverter to the array.
What about approvals?
Grid-connected systems need approval from your electricity distributor; ask them for the current requirements.
Related products
-
SolaX
SolaX 5kW Single Phase On-Grid Solar Inverter (X1-MINI-5K-G4-P)
৳33,000 In stock -
Jinko Solar
Jinko 750W Bifacial With Dual Glass Solar Panel
৳14,850 In stock -
LONGi
LONGi 615W Mono Solar Panel (SREDA approved)
৳12,177 In stock -
LONGi
LONGi 640W Mono Solar Panel
৳12,672 In stock